Tangible results of our technical audit

Before and after technical intervention in commercial building

Megaplaza La Paz Shopping Center

2024-2025 La Paz, Bolivia

The Challenge

During the construction of this 35,000 m² shopping center, differential settlement issues were detected in a section of the foundation, compromising the structural stability of the complex. The client hired us to perform a complete evaluation and propose solutions that would not significantly delay the construction schedule.

Our Solution

We implemented an intensive inspection protocol using 3D scanning technology to precisely identify affected areas. After analyzing the results, we designed a structural reinforcement strategy that included:

  • Polyurethane resin injection to stabilize the soil
  • Installation of additional micropiles at strategic points
  • Reinforcement of foundation beams with carbon fiber

Results

Our intervention allowed for the correction of the structural problem without the need to demolish already built sections, representing a saving of approximately $1.2 million for the client. The shopping center opened as scheduled and has operated without incidents since then, complying with all international safety standards.

98% Structural correction
$1.2M Estimated savings
0 Days of delay
Aerial view of infrastructure project with inspection in progress

Bicentenario Bridge Cochabamba

2023-2024 Cochabamba, Bolivia

The Challenge

The Bicentenario Bridge project, with a length of 1.5 km, presented significant challenges due to its location in an area with moderate seismic activity and varying geological conditions. Municipal authorities hired our services to ensure the structure met international standards for seismic resistance and durability.

Our Solution

We developed a comprehensive audit program that covered all phases of the project:

  • Exhaustive review of structural calculations and seismic simulations
  • Laboratory analysis of all material batches before installation
  • Continuous monitoring during construction with strain sensors
  • Load tests on completed sections to verify structural behavior

Results

Our team identified and corrected 17 significant deviations from international standards during the construction process. The bridge was certified with the capacity to resist seismic events of up to 7.5 on the Richter scale, exceeding local requirements. The structure has been recognized for its technical excellence and has become a benchmark for safe infrastructure in Bolivia.

17 Corrected deviations
7.5 Seismic resistance (Richter)
100% ISO 21931 Compliance

Los Altos de Santa Cruz Residential Complex

2022-2023 Santa Cruz, Bolivia

The Challenge

This luxury residential complex, consisting of 8 apartment towers, required international certification to access foreign financing. Investors needed guarantees that the project met international standards for quality, energy efficiency, and structural resistance.

Our Solution

We implemented a multi-level certification program that included:

  • Complete audit of architectural and structural designs
  • Verification of energy efficiency according to LEED standards
  • Inspection of fire protection and evacuation systems
  • Accessibility evaluation according to international regulations
  • Quality monitoring during all construction phases

Results

The project received the required international certification, allowing it to secure $45 million in foreign financing. Additionally, our recommendations for energy efficiency improvements resulted in a projected 32% reduction in energy consumption, significantly increasing the market value of the units.

$45M Secured financing
32% Energy consumption reduction
15% Market value increase

Audit Results

Measurable impact of our services

Improved Safety

In the last 5 years, projects audited by Annuitypq have recorded zero significant structural incidents, compared to the national average of 3.7 incidents per project of similar scale.

Cost Savings

Our clients report an average saving of 18% in maintenance costs during the first 10 years of operation, thanks to early detection of potential problems during the construction phase.

Regulatory Compliance

100% of our audited projects have obtained required certifications and permits on the first instance, without the need for subsequent corrections, accelerating delivery times.

Increased Value

Real estate projects that have our quality certification reach a market value between 10-15% higher than comparable projects without independent certification.

Ready to elevate your project standard?

Contact us today for an initial consultation without obligation.

Request Consultation

What Our Clients Say

Testimonials from those who trust our experience

"Annuitypq's intervention in our project was decisive. They identified structural problems that had gone unnoticed and provided us with practical solutions that not only saved the project but also significantly improved its overall quality."

Carlos Mendoza

Director of Projects, Grupo Inmobiliario Altiplano

"As a financial institution, we needed solid guarantees on construction quality before approving financing. Annuitypq's detailed report provided exactly the technical information we needed to make an informed decision."

Laura Fernández

Risk Manager, Banco Nacional de Bolivia

"Annuitypq's certification allowed us to differentiate ourselves in a competitive market. Buyers greatly valued the independent quality guarantee, which allowed us to sell all units in record time and at a premium price."

Javier Morales

CEO, Desarrolladora Andes Sur